Getting Started

  • We recommend 4-6” of topsoil
  • Rake all large rocks & debris, level soil and then pack firmly with a lawn roller
  • Apply 11-51-0 fertilizer provided by us (FREE WITH ALL TURF ORDERS)
  • Begin installation along the longest straight line, such as a driveway or sidewalk
  • Stagger the joints in each row in a brick-like fashion. Avoid any overlaps or gaps!
  • Roll with a lawn roller.
  • Water immediately. In hot weather, water while installing.
  • Keep turf moist for approximately 2 weeks until firmly rooted.
  • Be sure your turf has enough moisture to survive hot, dry or windy periods.
  • Begin mowing when turf roots are difficult to separate from the soil, mowing high the first time bringing it down to the desired height gradually.

Make Your Yard Beautiful

Star

Call us today!

Click Here
Copyright Lavington Turf Farms Ltd. 2017 - Legal
Created by

Legal notice